Client Spotlight:
O-I Glass and GridBeyond established innovative battery storage system
Energy storage system at O-I’s Alloa, UK, plant helps balance the grid, reduces peak load, optimizes the use of renewable electricity, and increases O-I’s resilience against brownouts.
The innovative 8MW battery system and supporting energy management system (EMS) leverages artificial intelligence to significantly enhance energy efficiency, resilience and sustainability.
Learn more by downloading the case study brochure.
This project is financed in support from Triodos Energy Transition Europe Fund
The partnership between GridBeyond and Triodos Energy Transition Europe Fund has a phase one commitment of €10M and will allow for the installation of a pipeline of battery storage projects located behind the meter at GridBeyond’s clients’ sites across the UK and Ireland.